fawadazeem9364 fawadazeem9364
  • 06-06-2023
  • Engineering
contestada

After a re-evaluation of the duration of activity B, it has been provided the following data. Most likely duration = 10 Optimistic Duration = 16 Pessimistic Duration = 25 Using the three-point estimating technique the new duration of activity B is a. 7 b. 15 c. 17 d. 22

Respuesta :

Otras preguntas

An area within the nucleus that appears through the microscope due to the densely stained chromatin fibers where ribosomal rna is being produced in high quantit
why was the louisiana purchase important to thomas jefferson
Is 23 a rational number
What’s 6.64 divided by 0.04 and how do I work it out
With the assumption that schmid-type metaphyseal chondrodysplasia is rare, is this type of dwarfism inherited as a dominant or recessive trait and why?
How to analyse Obama’s speeches
Can someone give me the answers plz:)
What 4 political regions are part of the United Kingdom?
if y varies directly as x, and y is 180 when x is n and y is n when x is 5, what is the value of n?
Which structures are contralateral? left leg, right leg right leg, right arm liver, heart superior vena cava, inferior vena cava left leg, right leg and right l
good job