To complete a work, A takes 50% more time than B. If together they take 18 days to complete the work, how much time shall B take to do it ?
A 30 days
B 35 days
C 40 days
D 45 days

Respuesta :

Otras preguntas

Mary, Kevin, and Ahmad served a total of 126  orders Monday at the school cafeteria. Kevin served 6  more orders than Mary. Ahmad served 4  times as many orders
Which of the following describes The local softball team won the championship "against all odds". A. prepositional B. participial C. gerund D. infinitive
The height of a particular triangle equals its base length. A new triangle is formed by dividing the hype by 2 and its area is 36 in^2 less than the area of the
please help me with this parent function
When is a rhombus a rectangle?
Clutter on the stairs has no affect on the risk of tripping and falling. (4 points) Question 6 options: 1) True 2) False
Classify the industries as primary secondary or tertiary
how does a pluripotent cell differ from a totipotent cell​
The period and frquency of a wave are inversely related true or false​
given the function f(x)=-2x^2+3x+10 find f(1) and f(3) choose the statement that is true concerning these two valuesthe value of f(1) us the same as the value o
good job