we know that

if 4 electricians can complete a job in 8 hours
then
100% of a job -------> 8 hours
x------------------> 1 hour
x=100/8----> x=12.5%

divide by 4 electricians
12.5%/4-----> 3.125%
that means each electrician can complete 3.125% of a job in 1 hour

therefore
3 electricians-----> 3*3.125%----> 9.375% in 1 hour
so
9.375%-----------> 1 hour
100%--------------> x
x=100/9.375----> x=10.67 hours

the answer is
10.67 hours

Answer Link

Otras preguntas

________ is the centralized policy-based management of all information required for access to corporate systems by people, machines, programs, or other resource
I need to find the answer
What does phenomena mean
Water flows into a swimming pool at the rate of 5.85 gal/min. If the pool dimensions are 21.2 ft wide, 46.1 ft long and 19.4 ft deep, how long does it take to f
what is big history can some help me please
I need help with starring the answer in mixed fraction
Liz had attended class everyday since she started school as a kindergartener. She said she had been in school for about a thousand days what could the actual n
The mass of a solid cube is 725 g, and each edge has a length of 6.35 cm. Find the density of the cube. Answer in units of kg/m3.
What other structures of the cytoskeleton would show the same pattern of microtubules as the flagellum?
How did crop rotation change in the agricultural revolution in comparison to earlier societies?
good job