h0un8treanzalSem
h0un8treanzalSem h0un8treanzalSem
  • 06-04-2016
  • Computers and Technology
contestada

24) The process of ensuring the accuracy of data and their conversion from raw form into classified forms appropriate for analysis is called _____.
A. coding
B. data entry
C. data preparation
D. data measurement

Respuesta :

JJDM JJDM
  • 06-04-2016
C) data preparation.
 Is the process of ensuring the accuracy of data and their conversion from raw form into classified forms appropriate for analysus
Answer Link

Otras preguntas

Write the prime factorization of 6. Use exponents when appropriate and order the factors from least to greatest (for example, 2235).
In the rock cycle, rocks can change into three different forms. These are _____.
A construction job requires 16 pieces of steel, each 7.96 ft long.  What length of steel is needed?
The five major areas of the study of Earth science are
Two hundred billion four hundred million expanded form
There are 20 mice in a 5 m^2 field ecosystem. The population density of mice is _____.
There are 20 mice in a 5 m^2 field ecosystem. The population density of mice is _____.
Is it true that bacterial root infections by Rhizobium should be cured immediately?
Identify the individual who was responsible for explaining the circulatory system.
Explain the process that occurs when a flowering plant reproduces.
good job