ZariaZ8005 ZariaZ8005
  • 09-04-2019
  • Mathematics
contestada

It took the construction company 63 days to complete the building. How many weeks did it take? (1 week = 7 days)

Respuesta :

Brennamm Brennamm
  • 09-04-2019

Answer:

It took 9 weeks, 63/7 = 9

Step-by-step explanation:

Answer Link

Otras preguntas

Bacteria are grouped into two Kingdoms and two Domains which are equivalent. Select the one showing the correct pairings below (Kingdom: Domain). Archaebacteri
Why do some astronomers think pluto should not be called a planet?
Rubber-tipped forceps can be used to A. restrain a rabbit for venipuncture. B. transport a rabbit to another cage. C. restrain a gerbil for venip
A 160-n child sits on a light swing and is pulled back and held with a horizontal force of 100 n. the magnitude of the tension force of each of the two supporti
How are the mongols justly and unjustly portrayed by history?
Which of the following describes the decimal equivalent of 5/9? terminating decimal repeating decimal non-terminating, non-repeating decimal integer
At allen and thomas architects, a group of designers are developing the first drawings for a proposed multiuse office development in an older section of a large
One of the main goals of total quality management is to focus on _____.
What is the relationship between the ratios?
Production of ________________ greatly complicates the situation in afghanistan. select one: a. taliban b. nuclear weapons c. cocaine d. guns e. opium
good job