Jane is a Product Owner. It is day seven of the Iteration and her team tells her that they may miss their Iteration commitment. What should Jane do?

Respuesta :

bogadu
bogadu bogadu
  • 10-01-2020

Answer:

Support pulling a story that has not been started.

Explanation:

To meet up with their iteration commitment, Jane should support pulling a story that has not been started.

Answer Link

Otras preguntas

The Greek root tropos means "mixing." Why is this appropriate for Earth's troposphere? a. The air in the troposphere mixes with gas molecules from space. b. W
Explain whether each equation is a linear equation. 1. y = x^2 - 1 2.y = 1 - x
How many solutions are there to the following system of equations? 2x+5y=-11 10x+25y=-55 A. 0 B. 2 C. 1 D. Infinitely many.
cuáles son algunos temas que muchos poetas hispanos usan en sus poesías
solve i=prt for t if i=105 p=700 and r=0.05
Anita grew a garden with 3/4 of the area for vegetables. In the vegetable section, 1/6 of the area is carrots. What fraction of the total garden is carrots?
Hazardous wastes are not found in residential homes. a. True b. False
Which sediment particle from rocks is the smallest
What is the name of the geometric term that is described by three points that are not on the same line and has a flat surface that extends without end in all di
What is the difference between civil liberties and civil rights?
good job