ritahastie919 ritahastie919
  • 06-03-2020
  • Business
contestada

If the actual level of activity is 4% less than planned, then the fixed costs in the static budget should be decreased by 4% before comparing them to actual costs.

a. True
b. False

Respuesta :

ochukoorakpoghenor
ochukoorakpoghenor ochukoorakpoghenor
  • 11-03-2020

Answer: false

Explanation:

Answer Link

Otras preguntas

Jasmine buys 21 cans of dog food. She gives 1/3 of the cans of dog food to her neighbor and she keeps the rest of the cans for her puppy. Jasmine puppiy eats 4
A line on a speed-time graph with a steep slope indicates a greater speed? true or false
neg3to the third powerdivided by negthreeto the two powerminicefour
Which text structure best matches this sentence? If your printer does not print, make sure it is powered up and connected to your computer according to the man
why is it important to warm up your muscles before a workout?
-2x+3-4x=p Please help me!!
For which information should a writer of an essay provide a source?
Cheerios 3.68 for 17 oz vs Apple Jacks 2.98 for 13 oz
Which set of paper towels is the better buy? 9 rolls for $8.73 or 14 rolls for $12.32?
Explain what the name scandium(III) oxide means in terms of electrons lost and gained, and identify the correct formula.
good job