contestada

Employees who will have performance evaluated according to the budget standards should not be involved in preparing the budget.

a. True
b. False

Respuesta :

ayfat23
ayfat23 ayfat23
  • 10-11-2020

Answer:

false

Explanation:

Answer Link

Otras preguntas

Write the pseudocode for this flowchart
7 decreased by the product of 4 and k
A recipe calls for 2/3 cup of milk. How much milk should be used to make 1/6 of the recipe?
A man is lying on the beach, flying a kite. He holds the end of the kite string at ground level and estimates the angle of elevation of the kite to be 55°. If t
¿Considera correcto dividir los géneros literarios Incas a partir de la categoría de estilos europea?
How many states are within Germany's borders? A ten B. twelve C. three D sixteen
Question 3 "Try Again." Mary needs 3 feet of boondoggle for a craft project. Boondoggle costs $0.25 per inch. How much will the project cost Mary?
two glass tubes are placed in water one of them has very concentrated sucrose solution while the other has a concentrated sucrose solution after an hour what wi
can u pls show me how to do it and answer
Write a letter to your father thanking him for the book and tell him why you like it​
good job