daisywolfe daisywolfe
  • 09-11-2016
  • Social Studies
contestada

A potential cost for a government leader using a cost-benefit analysis is

Respuesta :

Jhernandez3399 Jhernandez3399
  • 09-11-2016
A potential cost for a government leader using a cost-benefit analysis is that the leader will fail to consider all the variables that will contribute to the outcome of whatever he or she is planning, since it is often hard to anticipate all possible scenarios in such an analysis
Answer Link
destroythefirst
destroythefirst destroythefirst
  • 13-10-2020

Answer:

its is D a lower chance of reelection.

Explanation:

It is correct because I like spongebob and have a big left toe, and i got a 10% and this is one of the ones I got correct :)

Answer Link

Otras preguntas

Carlon plans to evaporate a number of gallons of water from 90 gallons of a 15% salt solution to make a 25% salt solution. Which equation can he use to find x,
Please help asap! leaf plot
What is a limiting amino acid in a dietary protein?
What was the name of the series of laws put in place to encourage the 13 English colonies to trade with England
julieta tirou do freezer uma refeicao que estava a dois graus negativos aqueceu a refeicao e a temperatura subiu 27 graus a que temeratura ficou a refeicao
When did the ebola outbreak start in the us?
Which ordered pair represents the x-intercept for the linear equation, 3y + 4x = 8?
Solve for:x^2+4=40andx^2+8x+16=20
Find the greatest common factor: 3x^2 – 15x^4
An opening in the chest wall for insertion of a chest tube is called
good job