balasupramaniyamraja
balasupramaniyamraja balasupramaniyamraja
  • 09-06-2021
  • Mathematics
contestada

8 man takes 15 days to cut a drain. How many men should be employed to complete the
work?​

Respuesta :

llbedoya
llbedoya llbedoya
  • 09-06-2021

Answer: 8 x 15 = 120

Answer Link

Otras preguntas

For a given velocity of projection in a projectile motion, the maximum horizontal distance is possible only at ө = 45°. Substantiate your answer with mathematic
All countries have what type of economy? A. Command B. Mixed C. Traditional D. Market
Into what body of water does the ganges river flow?
A sealed balloon filled with air that has a volume of 6 cubic inches at 99 feet will have a volume of _____ cubic inches at 33 feet.
Why is the closing scene in the Alchemist important
In four-seater countries, temperature drops below 0 ° C during peak winter. Why only the frozen surface of the water instead of the whole river and the lake fre
One survey estimates that, on average, the retail value of a mid-sized car decreases by 8% annually. If the retail value of a car is V dollars today, which expr
The students at Midtown Middle school sold flowers as a fundraiser in September and October. In October, they charged $1.50 for each flower. The October price w
What does the sign “the folly of england and the ruin of america” mean?
What are the commands used in windows 2012 to mount the nfs share on the linux server?
good job