becerralauren2010 becerralauren2010
  • 07-10-2021
  • Mathematics
contestada

To pay for his art supplies, Travis makes hand-painted skateboards to sell online. He paints 2
skateboards every 7 days.
Complete the table

To pay for his art supplies Travis makes handpainted skateboards to sell online He paints 2 skateboards every 7 days Complete the table class=

Respuesta :

lillyinjune09
lillyinjune09 lillyinjune09
  • 07-10-2021

Answer:

14 days for 4 and 28 days for 8 and 42 for 12

Step-by-step explanation:

dobbke them to get your answer

Answer Link
s300067636 s300067636
  • 07-10-2021

Answer:

PLEASE ANSWER MY QUESTION AS WELL :)

HERE R UR ANSWER:

Day 2 = 14

Skateborads painted:

Day 3: 28 = 8

Day 4: 42 = 12

Step-by-step explanation:

Answer Link

Otras preguntas

The distance covered by one step is 2.5 feet long. how many steps would the average person take to travel 50 feet
A line has a slope of -5 and passes through (1,-1).which is the equation of the line in point - slope form?
Is 2,-5,-12,-19,-26 an arithmetic sequence
During energy transformations, sometimes energy is destroyed.is that true or false
why is 5/12 greater than 3/4
What answer of 5ab/8c divided by 10b/c help with  quotient
The man responsible for devising the modern scientific classification system still in use today is ______ .a. Carolus Linnaeusb. Sir Harry Johnstonc. Albert E
how do i write a word problem for $3.00 divided by $0.25
A line has a slope of -5 and passes through (1,-1).which is the equation of the line in point - slope form?
What does Para mean in latin?
good job