enjoyingprocess5863 enjoyingprocess5863
  • 08-10-2021
  • Mathematics
contestada

how many miles of the road does the crew have left to pave after 11 days?

Respuesta :

lynn18202
lynn18202 lynn18202
  • 08-10-2021
A construction crew needs to pave a road that is 205 miles long. The crew paves 8 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the following function.

L(d) = 205 - 8d
Answer Link

Otras preguntas

"E. coli bacteria get onto produce via contact with infected fecal matter. The bacteria multiply in soil and around roots but survival is reduced following exte
BRAINLIESTTTTTTTTTTT
Which measures did President Carter propose to help the US economy in the late 1970s?
please help i’m so confused
Please help me out!!!
The impact of pseudoscientific ideas of race on the jewish nation during the period of 1933 to 1946 grade 11 essay​
This is about square roots in math (This is for school, an assignment, homework, whatever.) Don’t delete Thanks so much for your help.
Why did Martin Luther have to appear before the German parliament?
The headlights of an automobile have two power ratings: 45 W for the low beam and 65 W for the high beam. How much is the current in the headlight filament of a
Which of the following functions is graphed below? O A. y -** 2-3 B. y - 4-3 C. y - x - 2-3 OD. y - x - 223
good job