a contractor hires 150 men to pave Philip Goldson highway in 30 days. How many men will he hire to do the same work in 20 days?​

Respuesta :

fieryanswererft
fieryanswererft fieryanswererft
  • 07-04-2022

Answer:

225 men

This conversion leads to the answer:

  • 30 days → 150 men
  • 1 days → (150 *30) men
  • 1 days → 4500 men
  • 20 days → (4500/20) men
  • 20 days → 225 men
Answer Link

Otras preguntas

Which group best describes the Mughal Empire? A. Group A B. Group B C. Group C
Book a has 24 more pages than book b. Book c has 4 times as many pages as book a. The total number of pages of pages of the three books is 180. How many pages d
-4(4x+4)=2(2-7x) how do u do this and you have to use WHO and check your answer by plugging it in the original equation.SHOW ALL WORK
how many times can 8 go into 17
A 1.0 liter container is filled with 0.300 M of PCl5 at 250◦C. The vessel is then held at a constant temperature until the reaction PCl5(g) ⇀↽ PCl3(g) + Cl2(g)
A spreadsheet program allows a user to _______. a. Perform complicated calculations automatically b. Deliver elegant presentation to a large audience easily c.
Ashley is 5 times as old as Nadia and is also 12 years older that Nadia.How old is Nadia?
How does the movement of air affect the type of weather that forms from high-pressure and low-pressure systems? SCIENCE!!!
Which of the following routes involves trade outside of the Byzantine Empire?
state the objects in the universe that reflect light from the stars
good job