In the EST graph above, what is the required time to complete task A? ​

In the EST graph above what is the required time to complete task A class=

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 06-05-2022

Answer:

  5 time units

Step-by-step explanation:

The number on the arrow in this graph is the task completion time.

__

The completion time for Task A is 5 time units.

Ver imagen sqdancefan
Answer Link

Otras preguntas

Two circuits are created using two identical light bulbs. In the circuit A, the bulbs are hooked up in series. In circuit B, the light bulbs are hooked up paral
Solve for r 1/2r-3=3(4-3/2
Why are initiative, referendum, and recall important tools for citizens?
after a picnic 5/12 of the cornbread is leftover. val eats 4/5 of the leftover cornbread what fraction of the cornbread does val eat. answer in simplest form
Answer question please
Rukmani and Nathan's reverence for nature as a life bringing force led them to name their daughter after a
Explain how to distinguish between rational and irrational numbers
You are preparing to drive a pick-up truck. The Florida seat belt law requires you to properly fasten your seat belt
given the function f(x)=(x+2) find each if the following f(1), f(-10),f(0)
Lines(s)perpendicular to QR
good job