katiekern3233 katiekern3233
  • 09-09-2017
  • Social Studies
contestada

What do the letters in the acronym downtime refer to lean methodology?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 22-09-2017
The acronym DOWNTIME referring to LEAN methodology stands for Defects, Overproduction, Waiting, Non-utilized Resources/Talent, Transportation, Inventory excess, Motion waste and Excess processing. DOWNTIME is a way of remembering easily the 8 wastes in a manufacturing. It is one of numerous acronyms for relating the 7 or 8 wastes in LEAN methodology.



Answer Link

Otras preguntas

Simplify (1 − cos x)(1 + cos x).
How many kilograms are in 2.5 grams ?
We hope everything will go.......(SWIM)
Find the value of m∠ADC.A. 90ºB. 117ºC. 18ºD. 24º
Bile is produced by which organ?Select one:a. Small intestineOb. Liverc. Stomachd. Gall bladder​
“Those were the Rommely women ...They were all slender, frail creatures with wondering eyes and soft fluttery voices. But they were made out of thin visible ste
Which of the following is true of the literary device of "foreshadowing"? A. hints about the characters of which the reader may not be aware B. hints, sometimes
Complete each of the statements A. Lines of force are lines used to represent ________ an ________ electric field B. The intensity of an electric field is the c
do the qualities called for in the ideal renaissance man and woman seem to emphasize in the individual or the group?
Complete each ordered pair so that it is a solution of the given linear equation. x - 4y = 4; (_,3), (4,_)
good job