kofistitt kofistitt
  • 09-10-2017
  • Mathematics
contestada

If 6 men can do a piece of work in 14 days, how many men are needed to do the work in 21 days?

Respuesta :

Stochastic
Stochastic Stochastic
  • 09-10-2017
Nine men are needed.
hope this helps
Answer Link
SchoolNerd1947
SchoolNerd1947 SchoolNerd1947
  • 09-10-2017
The answer should be 9 workers due to 7 day periods.

21/7 =3
3+6 =9

Answer:9
Answer Link

Otras preguntas

Which of the following best describes a disadvantage of a representative democracy compared to a direct democracy? Elections are unnecessary because birth and p
A difference between Babur and Akbar was that Babur was the first emperor of the Mughal Empire, while Akbar was its greatest leader. Akbar was the first emperor
d=vt+(1/2)at^2 solve for v
Which of the following are two of the expected demands made by the Treaty of Versailles toward Germany? Germany had to give back its agricultural regions. Germa
What is the main setting in the book code talker and what are three minor characters and describe them? Thank you for helping me.
With the threat of World War III on the horizon, the Cuban Missile Crisis was finally resolved by: a promise that the U.S. would never invade Cuba Fidel Castro
What is an informal organization with members who hold common political beliefs and work to influence government called? A. political party B. interest group
The specific gravity of water is 1.0. True False
how do you solve y=4x-9 y=x-3
Software that was designed to serve the needs of a specific company or organization is called:
good job