thomisonariel306 thomisonariel306
  • 06-11-2017
  • Health
contestada

Asking potential dating partners for a date is most likely to be reinforced on a ________ schedule.

Respuesta :

andriansp andriansp
  • 20-11-2017
the answer to this question is variable-ratio schedule
variable-ratio schedule refers to a schedule of reinforcement in which the response is being reinforced. after an unperdictable amount of response is being made.
The purpose of this type of scheduling is to create a high rate of responses.

Answer Link

Otras preguntas

The following are all components of what? • positioning of actors on stage • scenic backgrounds • props and costumes • lighting and sound effects A. Staging
What was Lincoln's attitude towards the defeat of the south during the civil war?
Can anyone help me write my MUN position paper?This is the example!
What is 12x squared - 9x + 15
What Did Crusaders Wear
2*12 ^(n) = 49 N= exponent
Danica has laid out floor tiles so they from a rectangle with a perimeter of 18 inches what is the difference between the greatest and least possible areas of t
the second largest prime factor of 38 is
how to factor the trinomial 3 x^{2} + 8 -3
How was the roman republic formed?
good job