twentyonepilots9
twentyonepilots9 twentyonepilots9
  • 09-01-2018
  • Physics
contestada

A 20.0 kg object is at rest, and then speeds up to 16.0 m/s. How much work was done on this system?
A.320 J
B.2,560 J
C.2,880 J
D.5,120 J

Respuesta :

mexican18
mexican18 mexican18
  • 09-01-2018
I beieve the correct answer is
B.2,560 J
Answer Link
jadenzeidane200 jadenzeidane200
  • 10-01-2018
the correct answer is 2,560 j
Answer Link

Otras preguntas

Write a two-column proof. Given: Quadrilateral GKJH is a parallelogram Prove: Triangle GLH is congruent to Triangle JLK
Role of continuing education and sustainable development for career advancement
What kind of material could have been used by early humans to make homes or shelters?
find the value of x, will mark brainliest
In one store, bananas cost 60 cents per pound. The cost, in dollars, of x pounds of bananas is 0.6x. What is the cost of 2.50 pounds of bananas?
why does the oxygen atom in a water molecule have negative charge?
Mark the points with the coordinates (4, 14), (22, 6), and (16, 18). Connect the points to form a triangle.
What is the radius and diameter of the following circle? So, if the circle is cut in half 24cm then what is the radius and diameter in cm.
Which graph is the graph of this fucntion
Choose the function that the graph represents. Click on the correct answer. y = f(x) = log1x y = f(x) = x4 y = f(x) = log(1/4)*
good job