bethanyf0218
bethanyf0218 bethanyf0218
  • 06-02-2018
  • Physics
contestada

If 3.0 newtons are required to lift a carton 12 meters, how much work is done? 0.0 J 4.0 J 15 J 36 J

Respuesta :

averyhall7 averyhall7
  • 06-02-2018
the answer is 36 J, W= force x distance
Answer Link
Muscardinus Muscardinus
  • 02-07-2019

Answer:

Work done, W = 36 joules

Explanation:

It is given that,

Force acting on carton, F = 3 N

This force is required to move a carton to a distance of 12 meters

We have to find the work done of the system. It is given by the product of force and distance i.e.

W = F. d

[tex]W=3\ N\times 12\ m[/tex]

W = 36 Joules

So, the work done is 36 joules. Hence, the correct option is (d) ''36 joules''.

Answer Link

Otras preguntas

Who coined the name for the United Nations?
The Spanish-American War took place in and around three island nations. What are their names? Costa Rica Philippines Cuba Jamaica Puerto Rico Hawaii
Imposing some sort of cost on trade that raises the price of the traded products is MOST LIKELY an example of A) a trade barrier. B) a trade surplus. C) a tra
what is 10/8=n/10 what is the answer
_____ rocks show different minerals or grains that have been segregated into layers or aligned nonrandomly.
What is one way the legislature can check the power of the chief executive
Simplify: 8(v+w) - 7(v+2w)
How many years are there in a decade
Which of the following singular nouns does not form an irregular plural? A. Ox b. Tooth c. Mouse d. Tree
Semantics is the study of: history word meanings philosophy English literature
good job